Research Project DEUCALION
Stations

Reports

Publications

Software


ΕΣΠΑ

Event 9, 20/11/13 – 21/11/13

Location Oinoi

Rainfall (mm)
24.00
Rainfall duration (h)
4.50
Mean rainfall intensity i mean (mm/h)
5.33
Maximum stage (m)
0.20
Peak discharge (m3/s)
1.15
Runoff (mm)
0.12
Runoff coefficient c
0.00
Runoff volume (hm3)
0.01

Download the time series as CSV file

The rainfall (total height of 24.0 mm) starts on 20/11 1:45 and ends on 20/11 8:00 with its peaks occurring on 20/11 7:15 (maximum intensity 19.2 mm/h). The discharge begins 4 hours and 30 minutes after the rainfall's start, with a steep rising branch, and reaches its peak ( 1.15 m3/s) on 20/11 8:00. Next, the discharge decreases abruptly until it reaches its zero value (20/11 17:30).

 


Location Gyra Stefanis

Rainfall (mm)
34.06
Rainfall duration (h)
7.00
Mean rainfall intensity i mean (mm/h)
4.87
Maximum stage (m)
1.71
Peak discharge (m3/s)
25.28
Runoff (mm)
1.59
Runoff coefficient c
0.05
Runoff volume (hm3)
0.23

Download the time series as CSV file

The rainfall (total height of 34.1 mm) starts on 20/11 1:45 and ends on 20/11 8:15 and the peaks occur on 20/11 7:15 (maximum intensity 26.1 mm/h) and on 20/11 7:45 (26.1 mm/h). The discharge begins 6 hours after the rainfall's start, with a steep rising branch, and reaches its peak (25.28 m3/s) on 20/11 9:15. Next, the discharge decreases abruptly until it reaches its zero value (21/11 11:30), following a smaller peak that occurs earlier.